📘 India Post IT Modernization Project – VV Academy Class Notes
https://t.me/+ImPB0BcWstNkY2Nl
- Project started in 2012 (Phase 1) and IT 2.0 launched in June 2022
- Vision: Transform India Post into a technology-enabled service provider
- Total outlay for IT 2.0: ₹5785 crores (2022–2030)
- Enable anytime-anywhere banking and insurance
- Enhance customer satisfaction and operational efficiency
- Ensure financial inclusion of rural population
- Digitize and integrate postal, banking, and insurance systems
- CSI: Core System Integrator (SAP ERP)
- FSI: Financial System Integrator (CBS/CIS)
- RSI: Rural System Integrator (RICT devices)
- NI: Network Integrator (WAN with NSP1 & NSP2)
- CM: Change Management (Employee training)
- MOH: Mail Operations Hardware (Devices for Postmen)
- SAP ERP, FINACLE (Infosys), CIS
- DPMS, PMA, IPVS, ECMS, HDMS
- MAC Binding, RICT Devices
- Mobile Banking (15-Oct-2019), Internet Banking (Dec-2018)
- Interoperable ATM (since 2016)
- QR-based Authentication, Digital Addressing
- Data Centre Facility (DCF) – since 2013
- Disaster Recovery Centre (DRC) – PTC Mysore
- Wide Area Network (WAN)
- PMC – Project Management Committee
- PEC – Evaluation, PIC – Implementation
- Steering Committee – Final Approval
- PMC Tracks P01 to P07 (HR, Banking, Insurance, Parcel, etc.)
- Dak Karmayogi, DIGI-DAK, Quick Matrix
- LMS, ESS Portal (SAP)
- Nanyatha – Letterbox clearance tracking
- Banking Toll-Free: 1800-425-2440
- General Helpdesk: 1924
- Portals: CRM, CPGRAMS, Quick Matrix
- CBS: Core Banking Solution
- CIS: Core Insurance Solution
- CSI: Core System Integrator
- FSI: Financial System Integrator
- RSI: Rural System Integrator
- PMA: Postman Mobile App
- DPMS: Delivery Postman Management System
- IPVS: India Post Visibility System
👉 Join VV Academy Telegram Channel
📘 India Post IT Modernization Project
🔹 1. Introduction to IT Modernization Project
- Launched to transform India Post into a technology-enabled, self-reliant market leader.
- It aims to enhance the quality of postal and financial services through IT infrastructure and digital systems.
- Approved by the Government with an outlay of ₹5785 crores for the period 2022–23 to 2029–30 (under Project 2.0).
🔹 2. Objectives
- Improve customer satisfaction and service delivery.
- Enable financial inclusion of the rural population.
- Establish anywhere-anytime banking and insurance services.
- Optimize mail and parcel networks.
- Ensure integration of postal, banking, and insurance services via a single platform.
🔹 3. Segments (Silos) of IT Modernization
- CSI (Core System Integrator): Digitalizes all departmental operations including mail, finance, HR, and counter services.
- FSI (Financial System Integrator): Computerizes POSB and Postal Life Insurance services using CBS and CIS platforms.
- RSI (Rural System Integrator): Provides digital devices and support to rural BOs via RICT.
- NI (Network Integrator): Ensures WAN-based network connectivity for all post offices.
- CM (Change Management): Trains employees (including GDS) for working in a digital environment.
- MOH (Mail Operations Hardware): Supplies smart phones, printers, and devices to postmen and mail offices.
🔹 4. Key Technologies and Tools
- CBS (Core Banking Solutions): Facilitates online banking for POSB.
- CIS (Core Insurance Solutions): Provides one platform for PLI/RPLI.
- SAP-ERP: Used under CSI for accounts, HR, and operations.
- FINACLE: Developed by Infosys for banking transactions.
- DPMS (Delivery Postman Management System): Tracks mail delivery.
- PMA (Postman Mobile App): Used for delivery updates and GPS tracking.
- ECMS: Enterprise Content Management System.
- HDMS: Help Desk Management System.
🔹 5. Infrastructure & Support
- RICT Devices: Supplied to BPMs; include micro-ATM features.
- MAC Binding: Used for secure hardware-software integration.
- Disaster Recovery Centre (DRC): Located at PTC Mysore.
- Data Centre Facility (DCF): Started in 2013; core data handling hub.
🔹 6. Committees and Governance
- PMC (Project Management Committee): Oversees all tracks.
- PEC (Project Evaluation Committee): Reviews performance.
- PIC (Project Implementation Committee): Executes rollout.
- Steering Committee: Approves and monitors implementation.
🔹 7. Major Initiatives
- DARPAN: Digitization of rural post offices.
- Dak Karmayogi: E-learning portal for postal staff.
- IPVS (India Post Visibility System): Monitors mailbag operations.
- Nanyatha: Used for letterbox clearance monitoring.
🔹 8. Network and Integration
- NSP-1 & NSP-2: Network service providers under NI.
- WAN (Wide Area Network): Backbone for India Post’s digital infrastructure.
🔹 9. Customer Services
- ATM Interoperability: Started in 2016.
- Mobile & Internet Banking: Started from October 2019.
- Toll-Free Numbers:
- Banking-related grievances: 1800-425-2440
- General Help Centre: 1924
🔹 10. IT Modernization 2.0
- Approved in June 2022.
- Consultant: PwC (PricewaterhouseCoopers), London.
- Features:
- Banking & Insurance interface
- Parcel & mail tech upgrades
- Integrated project tracking via PMC Tracks (P01 to P07)
- Enhanced fraud risk management and cyber security
📘 VV Academy Class Notes
✨ India Post – IT Modernization Project (2012 & 2.0)
🔹 1. Background and Vision
- Project Start Year: 2012 (Phase 1), Phase 2 (IT 2.0) approved in June 2022
- Vision:
“To transform India Post into a technology-enabled, self-reliant market leader providing seamless, inclusive and citizen-centric services.” - Primary Focus:
- Digitization of Postal, Banking, and Insurance services
- Improve operational efficiency, employee productivity, and customer experience
🔹 2. Objectives of IT Modernization
- Enable anytime-anywhere banking
- Provide Core Insurance Solutions (CIS) and Core Banking Solutions (CBS)
- Introduce Digital Rural Outreach (DARPAN)
- HR automation via SAP-ERP (CSI)
- Establish a Disaster Recovery and Data Center
- Financial inclusion in rural India
🔹 3. Project Phases
🟩 Phase 1 (2012–2020)
- Components: CSI, FSI, RSI, NI, MOH, CM
- Focus: Digital infra, automation of PO functions
🟩 Phase 2 (2022–2030) – IT Modernization 2.0
- Outlay: ₹5785 Crores
- Duration: 2022–23 to 2029–30
- Consultant: PwC, London
🔹 4. Core Segments (Silos)
Segment | Full Form | Key Function |
CSI | Core System Integrator | Digitization of business & HR operations (SAP) |
FSI | Financial System Integrator | CBS, CIS, ATM, POSB, PLI |
RSI | Rural System Integrator | RICT devices to BPMs |
NI | Network Integrator | WAN connectivity across DoP |
CM | Change Management | Employee training & adoption |
MOH | Mail Operations Hardware | Equipment for Postmen/mail offices |
🔹 5. Key Technologies & Systems
- SAP ERP Modules: HR, F&A, MM, PMA
- Finacle: Banking software by Infosys
- CIS (Core Insurance Solution): For PLI/RPLI
- DPMS: Delivery Postman Management System
- PMA: Postman Mobile App (Android app for delivery updates)
- IPVS: India Post Visibility System (for article tracking)
- Nanyatha: Software for Letter Box monitoring
- DARPAN: Digitization of Branch Post Offices (BOs)
- ECMS: Enterprise Content Management System
- HDMS: Help Desk Management System
🔹 6. Hardware & Network
- RICT Devices: Biometric, solar-powered micro-ATM for BPMs
- MAC Binding: Device-security mechanism
- WAN (Wide Area Network): Connectivity backbone
- NSP-1 & NSP-2: Network Service Providers
- Disaster Recovery Centre: Mysuru
- Data Centre Facility (DCF): Started in 2013
🔹 7. Operational Enhancements
- Digital Services:
- ATM & Mobile Banking
- Internet Banking
- QR Code-based Authentication
- Digital Addressing: Based on Latitude–Longitude
- ATM Interoperability: From 2016
- Toll-free Support:
- Banking: 1800-425-2440
- General Helpdesk: 1924
🔹 8. Organizational Structure – Committees
Committee | Role |
PMC (Project Management Committee) | Owns tracks; ensures rollout |
PEC (Project Evaluation Committee) | Reviews projects & tracks |
PIC (Project Implementation Committee) | Coordinates execution |
Steering Committee | Final approval & oversight |
🔹 9. IT Modernization Project 2.0 – PMC Tracks
Track Code | Technology Focus | Head |
P01 | HRMS & Admin | Member (Personnel) |
P02 | Banking Tech | DDG (Financial Services) |
P03 | Insurance Tech | CGM (PLI) |
P04 | Parcel/Mail Tech | CGM (Parcel) |
P05 | Retail & BD | DDG (BD) |
P06 | Rural Infra | GM (CEPT) |
P07 | Security & Audit | GM (CEPT) |
🔹 10. Digital Initiatives
- Dak Karmayogi: e-Learning Portal
- Quick Matrix: Complaint registration portal
- ESS Portal: SAP-based Employee Self Service
- LMS: Lead Management System
- DIGI-DAK: Digital transformation program
🔹 11. Miscellaneous Abbreviations
Abbreviation | Full Form |
CBS | Core Banking Solution |
CIS | Core Insurance Solution |
DRC | Disaster Recovery Centre |
STR | Suspicious Transaction Report |
GL | General Ledger |
SAP | Systems, Applications & Products |
PMU | Project Management Unit |
SMPS | Switched-Mode Power Supply |
RTGS | Real-Time Gross Settlement |
SSA | Sukanya Samriddhi Account |
IPVS | India Post Visibility System |
- INTRODUCTION & OVERVIEW
- The India Post IT Modernization Project was launched to transform India Post into a technology-driven, efficient, and customer-centric service provider.
- It aims to provide end-to-end IT enablement of core postal operations.
- The IT Modernization Project has been rolled out in two phases:
- Phase 1 (2012-2020)
- Phase 2 (IT Modernization 2.0: 2022–2030)
- Phase 2 was approved in June 2022 with an outlay of Rs. 5785 crores.
- OBJECTIVES
- Technology enablement across all services
- Financial inclusion of the rural population
- Provide real-time, anywhere-anytime banking and insurance services
- Improve customer satisfaction and operational efficiency
- Digitize and integrate postal, financial, and insurance systems
- Train all employees including GDS for digital adaptation
- MAJOR COMPONENTS / SEGMENTS (SILOS)
- CSI – Core System Integrator
- Handles mail operations, accounting, HR, POS operations
- Based on SAP ERP system
- FSI – Financial System Integrator
- Handles CBS (Core Banking Solutions) and CIS (Core Insurance Solutions)
- Covers POSB and PLI/RPLI
- RSI – Rural System Integrator
- Focuses on Branch Post Offices (BPMs)
- Provides RICT (Rural ICT) devices
- NI – Network Integrator
- Provides WAN connectivity to all post offices
- Uses NSP-1 and NSP-2 for network service
- CM – Change Management
- Training of all employees to handle new IT systems
- Improves employee readiness and service quality
- MOH – Mail Operations Hardware
- Supplies hardware like smartphones, scanners, printers to postmen
- CORE TECHNOLOGIES AND TOOLS
- SAP ERP: Used for HRMS, Accounting, Procurement, etc.
- FINACLE: Banking software developed by Infosys
- CIS: Core Insurance Solution
- DPMS: Delivery Postman Management System
- PMA: Postman Mobile App
- IPVS: India Post Visibility System for article tracking
- DARPAN: Project for digitizing Branch Post Offices
- HDMS: Help Desk Management System
- ECMS: Enterprise Content Management System
- MAC Binding: Security protocol for device binding
- RICT Devices: Handheld devices with micro-ATM features
- DIGITAL SERVICES
- Mobile Banking (Launched on 15-10-2019)
- Internet Banking (Started 14-12-2018)
- ATM Services (Started before 2015)
- Interoperable ATM Services (From 2016)
- QR Code Cards, AEPS, Biometric Authentication
- Digital Addressing using Latitude & Longitude
- INFRASTRUCTURE
- Data Centre Facility (DCF): Operational since 2013
- Disaster Recovery Centre (DRC): Located at PTC Mysore
- WAN (Wide Area Network): Nationwide connectivity backbone
- GOVERNANCE STRUCTURE
Committees:
- PMC: Project Management Committee (Track owners)
- PEC: Project Evaluation Committee
- PIC: Project Implementation Committee
- Steering Committee: Top-level policy and financial oversight
Project 2.0 PMC Track Committees:
- P01 to P07: Cover HRMS, Banking, Insurance, Parcel, Retail, Rural Infra, Security
- CUSTOMER SUPPORT & GRIEVANCE REDRESSAL
- Toll-Free Numbers:
- Banking/ATM/Mobile/SMS Grievances: 1800-425-2440
- General Help Centre: 1924
- Complaint Portals: CRM Portal, CPGRAMS, Quick Matrix (not CIC)
- ADDITIONAL PROJECTS & MODULES
- DARPAN: Digital Advancement of Rural Post Offices for a New India
- Nanyatha: Monitors Letterbox Clearance
- DIGI-DAK: Digitally Driven Accelerated Knowledgebase
- Dak Karmayogi: eLearning platform for all postal employees
- ECMS: Enterprise Content Management System
- LMS: Lead Management System
- KEY ABBREVIATIONS
- CBS: Core Banking Solution
- CIS: Core Insurance Solution
- CSI: Core System Integrator
- FSI: Financial System Integrator
- RSI: Rural System Integrator
- NI: Network Integrator
- CM: Change Management
- MOH: Mail Operations Hardware
- DPMS: Delivery Postman Management System
- PMA: Postman Mobile App
- IPVS: India Post Visibility System
- HDMS: Help Desk Management System
- SAP: Systems Applications and Products
- GL: General Ledger
- DRC: Disaster Recovery Centre
- STR: Suspicious Transaction Report
- RICT: Rural ICT
- SMPS: Switched Mode Power Supply
- RTGS: Real-Time Gross Settlement
- ESS Portal: Employee Self Service (SAP)
- SAP Modules: HR, FI, MM, ESS
- OTHER FACTS
- The first implementation under IT modernization began in 2012-13
- CEPT Mysuru developed many tools like Post Info, PMA
- CBS Teller ID = SOL ID + 4-digit number
- ATM and Mobile banking are integrated through FINACLE
- All counter operations are monitored via CSI
- CSI ID Management is done via IM Portal
- UAT stands for User Acceptance Testing
- Postal Acts have been amended to support IT rollout
"2024 PA/SA Exam IT Modernisation Questions from All 23 Postal Circles – With Answers"
2024 PA /SA EXAM IT MODERNIZATION QUESTIONS AND ANSWERS
1. Training of staff for new technology had planned under which segment of IT Modernization project
(LGO Exam-2024 Assam Circle)
a. CBS | b. MOH | c. CM | d. NI |
2. Word CBS is associated with which segment of IT Modernization project?
(LGO Exam-2024 Assam Circle)
a. FSI | b. CSI |
c. RH | d. None of the above |
3. "Delivery Postman Management System" (DPMS) is associated with which one of the following?
(LGO Exam-2024 Assam Circle)
a. CSI | b. CM | c. RH | d. FSI |
4. EMV chip is used in which of the item?
(LGO Exam-2024 Assam Circle)
a. ATM Card | b. RICT Device |
c. Bar code scanner | d. Network switch |
5. Terms "NSP 1 and NSP2" are associated with which of the following?
(LGO Exam-2024 Assam Circle)
a. Network connectivity | b. Finacle updates |
c. SAP updates | d. None of the above |
6. MAC binding is commonly used with reference to which segment of IT Modernization project?
(LGO Exam-2024 Assam Circle)
a. CSI | b. FSI |
c. CM | d. None of the above |
7. In terms "T-Code", alphabet T represents which of the following?
(LGO Exam-2024 Assam Circle)
a. Transaction | b. Transfer |
c. Technology | d. None of the above |
8. IT Modernization project has been divided into how many segments?
(LGO Exam-2024 Assam Circle)
a. Five | b. Six |
c. Seven | d. None of the above |
9. In reference with the IT Modernization project, the term PMU refers to?
(LGO Exam-2024 Assam Circle)
a. Project Management Unit | b. Power Management Unit |
c. Pressure Measuring Unit | d. None of the above |
10. Term "HFINRPT" is used in which of the following platform?
(LGO Exam-2024 Assam Circle)
a. DPMS | b. McCamish |
c. SAP | d. None of the above |
11. Business Intelligence (BI) is provided for under which component of the IT Modernization Project?
(LGO Exam-2024 Madhya Pradesh Circle)
a. CSI | b. FSI | c. MOH | d. NI |
12. Name the system Integrator that aims at computerizing the Postal Life Insurance through one platform?
(LGO Exam-2024 Madhya Pradesh Circle)
a. CIS | b. FSI | c. CSI | d. RSI |
13. Who is appointed as a consultant to study the status of the acquisition of IT capabilities in the organization and submit a report keeping the future growth of the organization in mind under IT Modernization Project 2.0?
(LGO Exam-2024 Madhya Pradesh Circle)
a. Accenture, Ireland b. Tata Consultancy Services, Mumbai
c. PricewaterhouseCoopers Pvt. Ltd (PWC). London d. Deloitte, London
14. The Silo in IT Modernization Project that aims at preparation of all the employees of the Department to enable them to function effectively in the IT environment is:
(LGO Exam-2024 Madhya Pradesh Circle)
a. CSI | b. FSI |
c. Change Management | d. RSI |
15. HDMS in CSI refers to:
(LGO Exam-2024 Madhya Pradesh Circle)
a. Help Desk Management System b. Help Desk Monitoring Setup
c. Hard Disk Management System d. High Definition Management Setup
16. A "SOL" in Core Banking Solutions (CBS) refers to:
(LGO Exam-2024 Madhya Pradesh Circle)
a. Sub Office layout | b. Service Organization layout |
c. Service Outlet | d. Systematic Outlet |
17. Where is the Disaster Recovery Centre functioning for India Post?
(LGO Exam-2024 Madhya Pradesh Circle)
a. Delhi | b. Navi Mumbai |
c. Bangalore | d. PTC, Mysore |
18. Expand "NISG" under IT Modernization Project?
(LGO Exam-2024 Madhya Pradesh Circle)
a. National Informatics Survey by Government
b. National Informatics for Systematic Government
c. National Institute for Smart Government d. National Institute for Smart Governance
19. What is the Toll Free number for ATM/debit card, mobile/internet/ SMS
banking- related grievances in the Department of Posts?
(LGO Exam-2024 Madhya Pradesh Circle)
a. 1800 524 4240 | b. 1800 425 2440 |
c. 1800 245 4240 | d. 1800 254 2440 |
20. Under IT Modernization Project. Post offices have been interconnected using which type of networks?
(LGO Exam-2024 Madhya Pradesh Circle)
a. Metropolitan Area Network (MAN) b. Wireless Local Area Network (WLAN)
c. Wide Area Network (WAN) d. Provisional Area Network (PAN)
21. Through CSI, the Department of Posts has digitalized:
(LGO Exam-2024 Tamilnadu Circle)
a. Mails and Counter operations b. Finance and Accounts
c. Human Resource Management Functions d. All of the above
22. The counter user at the post office cannot login to multiple systems at the same time as the systems are bound with:
(LGO Exam-2024 Tamilnadu Circle)
a. MAC-Media Access Control b. MAC-Mapped Access Control
c. MAC-Mapped Automated Control d. None of the Above
23. HDMS in CSI refers to:
(LGO Exam-2024 Tamilnadu Circle)
a. Help Desk Management System b. Hard Disk Management System
c. Help Desk Monitoring Setup d. None of the above
24. "EMV chip" is used in which of the following items?
(LGO Exam-2024 Tamilnadu Circle)
a. BI Tools | b. RICT Device |
c. QR card | d. ATM Card |
25. With reference to RICT, which of the following cannot be considered a peripheral of the main computing device?
(LGO Exam-2024 Tamilnadu Circle)
a. Laser Printer | b. Thermal Printer |
c. 2D scanner | d. Fingerprint scanner |
26. The full form of IPVS is
(LGO Exam-2024 Haryana Circle)
a. IP Virtual Server | b. India Post Visibility System |
c. India Post Vertical System | d. India Post Vehicle System |
27. The full form of MPLS in MPLS Network technology
(LGO Exam-2024 Haryana Circle)
a. Main-Protocol Line System | b. Multi-Protocol Label Switching |
c. Multi-Protocol Line System | d. Main-Protocol Label Switching |
28. GL codes started with 3 in SAP represent
(LGO Exam-2024 Haryana Circle)
a. SB Heads | b. Revenue Heads |
c. Expenses Heads | d. Profit Heads |
29. InFinacle, each counter operator is allotted Teller cash id of how many digits
(LGO Exam-2024 Haryana Circle)
a. 8 digits | b. 13 digits | c. 12 digits | d. 10 digits |
30. When DAP PAY UPI app was launched by IPPB
(LGO Exam-2024 Haryana Circle)
a. 01.12.2020 | b. 25.12.2021 | c. 31.12.2022 | d. 15.12.2020 |
31. What is the toll free number for grievances of India Post ATM/Debit Card/Mobile/Internet/SMSBANKING?
(LGO Exam-2024 Haryana Circle)
a. 1800-268-6868 | b. 1800-435-2440 |
c. 1860-225-2540 | d. 1800-425-2440 |
32. Hat is amount approved by Government of India for India Post IT Modernization Project 2022?
(LGO Exam-2024 Haryana Circle)
a. Rs 4909Crores | b. Rs 5785Crores |
c. Rs 7440Crores | d. Rs 6575Crores |
33. Business Intelligence (B.I) is provided for which component of IT Modernization Project
(LGO Exam-2024 Haryana Circle)
a. CSI | b. FSI | c. MOH | d. NI |
34. ECMS is an abbreviation of
(LGO Exam-2024 Haryana Circle)
a. Enterprise Content Management System b. Enterprise Computer Management System
c. Enterprise Content Monitoring System d. Enterprise Computer Monitoring System
35. What is the toll free Enquiry Helpline number of IndiaPost?
(LGO Exam-2024 Haryana Circle)
a. 1800-266-6868 | b. 1800-268-6868 |
c. 1860-286-6868 | d. 1800-286-6868 |
36. Which one of the following committees is the owner of tracks and shall ensure Rollout, Operations and Management of application IT Modernization Project 2022?
(LGO Exam-2024 Jharkhand Circle)
a. Project Evaluation Committee (PEC) b. Project Implementation Committee (PIC)
c. Project Management Committee (PMC) d. Project Development Committee (PDC)
37. Which Silo of IT Modernization Project is considered as the "Brain of the Postal System" that integrates all the System Integrators?
(LGO Exam-2024 Jharkhand Circle)
a. FSI | b. RSI | c. CSI | d. NI |
38. Who is appointed as a consultant to study the status of the acquisition of IT capabilities in the organization and submit a report keeping the future growth of the organization in mind under IT Modernization Project 2.0?
(LGO Exam-2024 Jharkhand Circle)
a. Accenture, Ireland b. Tata Consultancy Services, Mumbai
c. PricewaterhouseCoopers Pvt. Ltd (PWC), London d. Deloitte, London
39. Name the project that aimed at the supply of required equipment like smart phones to postmen staff of Post Offices is:
(LGO Exam-2024 Jharkhand Circle)
a. Mail Network Optimization Project (MNOP) b. Project Arrow
c. Parcel Network Optimization Project (PNOP) d. Mail Operations Hardware (MOH)
40. HDMS in CSI refers to
(LGO Exam-2024 Jharkhand Circle)
a. Help Desk Management System b. Help Desk Monitoring Setup
c. Hard Disk Management System d. High Definition Management Setup
41. Mobile Banking for Post Office Savings customers was launched in India Posts on
(LGO Exam-2024 Jharkhand Circle)
a. 10-09-2018 | b. 15-10-2019 | c. 15-10-2018 | d. 19-10-2015 |
42. Expand SMPS used in a computer services
(LGO Exam-2024 Jharkhand Circle)
a. Short-Mode Power Supply b. Short Message Power Supply
c. Switched- Mode Power Supply d. Switched-Mode Power Service
43. What is the Toll Free number for ATM/debit ca mobile/internet/SMS banking related grievances the Department of Posts?
(LGO Exam-2024 Jharkhand Circle)
a. 1800 889 9860 | b. 1800 425 2440 |
c. 1800 245 4240 | d. 1800 254 2440 |
44. "CIS” stands for
(LGO Exam-2024 Jharkhand Circle)
a. Core Insurance System b. Core Insurance Solutions
c. Core Internet Solutions d. Core Integration System
45. “RTGS" refers to:
(LGO Exam-2024 Jharkhand Circle)
a. Real-Time Growth Settlement b. Real-Time Gross Settlement
c. Real-Time Global Settlement d. Retail-Trade Gross Settlement
46. Select the correct answer
i) RICT – Rural Information and Communication Technology
ii) CPC-Computerized processing Centre
iii) BAS – Biometric Attendance System
iv) DRC – Data Recovery Centre
(LGO Exam-2024 Kerala Circle)
a. i& ii are correct | b. i& iii are correct |
c. i& iv are correct | d. i, ii & iv are correct |
47. Fourth and fifth digits of a profit center ID represents
(LGO Exam-2024 Kerala Circle)
a. HO | b. SO | c. Division | d. Circle |
48. Mobile Banking for POSB Customers launched on
(LGO Exam-2024 Kerala Circle)
a. 16.11.2019 | b. 15.10.2019 | c. 15.10.2018 | d. 15.09.2019 |
49. EPIC stands for
(LGO Exam-2024 Kerala Circle)
a. Electronic Photo Identification Card b. Election Photo Identity Card
c. Elective Photo Identification Card d. Elector Photo Identity Card
50. In Data processing SAP stands for
(LGO Exam-2024 Kerala Circle)
a. Software Applications and Process b. System Analysis and Product
c. Software Analyst and Procedure d. Systems, Applications and Products
51. STR stands for
(LGO Exam-2024 Kerala Circle)
a. Savings bank transaction report b. Suspicious transaction report
c. Suspense account transaction record d. Stamps transit report
52. Dak Ghar Niryat Kendra (DNK) take care of
(LGO Exam-2024 Kerala Circle)
a. Commercial export | b. Aadhar Service |
c. Passport Service | d. All the above |
53. CELC in IPPB- stands for
(LGO Exam-2024 Kerala Circle)
a. Children Education Loan Credit | b. Child EnrolmentLite Client |
c. Child Enrolment Legal Client | d. Child EnrichmentLite Client |
54. Dak Karmayogi is a
(LGO Exam-2024 Kerala Circle)
a. OnlineDak sevak transfer portal | b. Dak sevak recruitment portal |
c. Online booking ofdak | d. e-learning portal |
55. Teller cash ID is SOL ID +…………..digit number
(LGO Exam-2024 Kerala Circle)
a. 3 | b. 4 | c. 5 | d. 12 |
56. Which one of the following is the part of IT modernization Project?
(LGO Exam-2024 Andhra Pradesh Circle)
a. Branch offices, Sub offices and Head Post offices b. Mail offices
c. Administrative offices d. All the above
57. Which one of the following is NOT the objective of IT Project 2012?
(LGO Exam-2024 Andhra Pradesh Circle)
a. Optimal Resource utilization and leveraging strengths of extensive retail network.
b. Introduction of single entry Accounting System (Cash Based Accounting).
c. Acquiring Brand equity of a leading edge service provider.
d. Employee delight.
58. Vision of India Post 2012 is
(LGO Exam-2024 Andhra Pradesh Circle)
a. To transform India Post as a reliable deliverer of business mail
b. Transforming India Post as an efficient market player
c. Transforming India Post into Technology enabled Self Reliant market leader
d. None of the above
59. How many business priorities are there for in India Post 2012 Project?
(LGO Exam-2024 Andhra Pradesh Circle)
a. 6 | b. 5 | c. 7 | d. 8 |
60. WAN means
(LGO Exam-2024 Andhra Pradesh Circle)
a. Width Area Network | b. World Area Network |
c. Wide Area Network | d. Wide Access Network |
61. RICT means
(LGO Exam-2024 Andhra Pradesh Circle)
a. Regional Information Communication Technology
b. Rural Information Communication Technology
c. Regional Communication Technology Integration
d. Rural Information Connecting Technology
62. Which one of the following is NOT the objective under Human Resources?
(LGO Exam-2024 Andhra Pradesh Circle)
a. To provide the administrative offices with centralized and accurate employee information.
b. Employee development through improvement in training administration and management.
c. All the above
d. None of the above
63. To achieve the "financial inclusion" of unbanked rural population is the objective under
(LGO Exam-2024 Andhra Pradesh Circle)
a. Postal Banking Operations | b. Rural Business |
c. E-Commerce | d. None of the above |
64. Terms "NSP-1 and NSP-2" are associated with which of the following?
(LGO Exam-2024 Chhattisgarh Circle)
a. Network connectivity | b. CSI updates |
c. SAP updates | d. BI Dashboard |
65. "EMV" chip is used in which of the item?
(LGO Exam-2024 Chhattisgarh Circle)
a. Network Switch | b. RICT Device |
c. Bar code scanner | d. None of the above |
66. "Any Time Anywhere Banking" is associated with?
(LGO Exam-2024 Chhattisgarh Circle)
a. CBS | b. TNF | c. DCF | d. RICT |
67. Data Centre Facility (DCF) started functioning in which year?
(LGO Exam-2024 Chhattisgarh Circle)
a. 2013 | b. 2015 |
c. 2017 | d. None of the above |
68. In IT Modernization project ATM service are covered under which vertical?
(LGO Exam-2024 Chhattisgarh Circle)
a. CSI | b. FSI | c. DCF | d. RH |
69. Term "HFINRPT is used in which of the following platform?
(LGO Exam-2024 Chhattisgarh Circle)
a. Finacle | b. Macmish |
c. CSI | d. None of the above |
70. In reference with the IT Modernization project, the term "PMU" refers to?
(LGO Exam-2024 Chhattisgarh Circle)
a. Project Management Unit | b. Power Management Unit |
c. Pressure Measuring Unit | d. Payment MethodUpdator |
71. IT Modernization project has been divided into how many segments?
(LGO Exam-2024 Chhattisgarh Circle)
a. Four | b. Six |
c. Ten | d. None of the above |
72. In term 'T-Code", alphabet T represents which of the following?
(LGO Exam-2024 Chhattisgarh Circle)
a. Transaction | b. Transfer |
c. Technology | d. None of the above |
73. MAC binding is commonly used with reference to which segment of IT Modernization project?
(LGO Exam-2024 Chhattisgarh Circle)
a. NI | b. FSI | c. CSI | d. CM |
74. Which one of the following committee is not part of the IT Modernization Project 2022?
(LGO Exam-2024 Delhi Circle)
a. Steering Committee b. Project Implementation Committee (PIC)
c. Project Evaluation Committee (PEC) d. Project Management Committee (PMC)
75. Who is appointed as a consultant to study the status of the acquisition of IT capabilities in the organization and submit a report keeping the future growth of the organization in mind under IT Modernization Project 2.0?
(LGO Exam-2024 Delhi Circle)
a. Accenture, Ireland b. Tata Consultancy Services, Mumbai
c. PricewaterhouseCoopers Pvt. Ltd (PWC), London d. Deloitte, London
76. The Silo in IT Modernization Project that aims at preparation of all the employees of the Department to enable them to function effectively in the IT environment is:
(LGO Exam-2024 Delhi Circle)
a. CSI | b. FSI |
c. Change Management | d. RSI |
77. Disaster Recovery Centre for India Posts has been functioning since:
(LGO Exam-2024 Delhi Circle)
a. 03-04-2013 | b. 03-04-2015 | c. 15-05-2015 | d. 04-03-2013 |
78. HDMS in CSI refers to:
(LGO Exam-2024 Delhi Circle)
a. Help Desk Management System b. Help Desk Monitoring Setup
c. Hard Disk Management System d. High Definition Management Setup
79. Expand "SMPS" used in a computer services?
(LGO Exam-2024 Delhi Circle)
a. Short-Mode Power Supply | b. Short Message Power Supply |
c. Switched-Mode Power Supply | d. Switched-Mode Power Service |
80. Name the project under IT Modernization that has facilitated the payment of Postal Life Insurance in Branch Post offices which was earlier restricted to SO/HOS?
(LGO Exam-2024 Delhi Circle)
a. CSI | b. DARPAN |
c. Postman Mobile App | d. IPPB App |
81. According to the IT modernization Project, "ECMS" stands for?
(LGO Exam-2024 Delhi Circle)
a. Enterprise Capacity Management System b. Enterprise Content Management System
c. Electronic Content Management Solutiond. Electronics Control Measurement and Signals
82. Which of the following offices are not parts of the IT Modernization Project?
(i) RLO (ii) CSD (iii) PSD (iv) RSD
(LGO Exam-2024 Delhi Circle)
a. (i) (ii) only | b. (ii) (iv) only | c. (ii) (iii) only | d. All of these |
83. Which of the following statements is true w.r.t. Network Integrator in
IT Modernization Project?
(LGO Exam-2024 Delhi Circle)
a. There are 3 Network service providers namely NSP1, NSP2 and NSP3
b. There are 2 Network service providers namely NSP1 and NSP2
c. There is only 1 Network service provider namely NSP1
d. There are 4 Network service providers from NSP1 to NSP4
84. Postal life insurance (PLI) services are being provided through?
(LGO Exam-2024 Gujarat Circle)
a. Core system integrator (CSI)
b. Digital Advancement of Rural Post Office forA New India (DARPAN)
c. Core Insurance Solution (CIS)
d. All the above
85. In CSI, the 15 – digit GL Head of account is changed to GL code with
(LGO Exam-2024 Gujarat Circle)
a. 9 digit | b. 10 digit |
c. 12 digit | d. None of these |
86. “TPIC” under IT Modernization project 2012 refers to
(LGO Exam-2024 Gujarat Circle)
a. Technical Projects Identification Committee
b. Telephone Personal Identification Code
c. Third Party Inspection Certificate
d. Technical Projects Implementation Committee
87. The counter operations module is handled by…………. project.
(LGO Exam-2024 Gujarat Circle)
a. RSH | b. NI | c. CSI | d. MOH |
88. Which one of the following Track contains HRMS in Postal IT Project 2.0?
(LGO Exam-2024 Gujarat Circle)
a. Accounting Interface (AI) | b. Management Interface (MI) |
c. Postal Interface (PI) | d. User Interface (UI) |
89. SOL in banking solutions (CBS) refers to
(LGO Exam-2024 Gujarat Circle)
a. Service outlet | b. System outlet |
c. Both (A& (B) | d. Both not |
90. Which of the following is Incorrect?
(LGO Exam-2024 Gujarat Circle)
a. (CCR) Counterfeit Currency Report b. (JPC) Jeevan Postal centre
c. (SAG)saansad Adarsh Grams d. (VPP) Value Payable Parcel
91. IT modernization project of Department of Posts has how many segments?
(LGO Exam-2024 Gujarat Circle)
a. 4 | b. 6 | c. 8 | d. 10 |
92. The Department has supplied computers, hardware and peripherals to Mail Offices and smart phones to Postmen staff under?
(LGO Exam-2024 Gujarat Circle)
a. DARPAN b. Financial Services System Integrator (FSI)
c. Rural System Integration (RSI) d. Mail Operation Hardware Project
93. How many modules in SAP ERP?
(LGO Exam-2024 Gujarat Circle)
a. 4 types | b. 3 types | c. 9 types | d. 2 types |
94. Name the project that aims at transforming the Department of Posts operational efficiency and improving service delivery of operational and administrative units through upgraded technology and connectivity?
(LGO Exam-2024 Himachal Pradesh Circle)
a. Project Arrow | b. PNOP |
c. MNOP | d. IT Modernization Project |
95. Financial System Integrator (FSI) stream of the IT Modernization project aims at computerizing the:
(LGO Exam-2024 Himachal Pradesh Circle)
a. Savings Bank only | b. Savings Bank and PLI |
c. PLI only | d. Savings Bank and HR |
96. Intra-operable Internet banking service has started in India Postsw.e.f
(LGO Exam-2024 Himachal Pradesh Circle)
a. 18-12-2015 | b. 18-12-2016 | c. 14-12-2017 | d. 14-12-2018 |
97. Who is appointed as a consultant to study the status of the acquisition of IT capabilities in the organization and submit a report keeping the future growth of the organization in mind under IT Modernization Project 2.0?
(LGO Exam-2024 Himachal Pradesh Circle)
a. Accenture, Ireland b. Tata Consultancy Services, Mumbai
c. PricewaterhouseCoopers Pvt. Ltd (PWC). London d. Deloitte, London
98. The implementation of the IT Modernization Project started in India Posts in the year:
(LGO Exam-2024 Himachal Pradesh Circle)
a. 2011-12 | b. 2012-13 | c. 2013-14 | d. 2014-15 |
99. HDMS in CSI refers to:
(LGO Exam-2024 Himachal Pradesh Circle)
a. Help Desk Management System b. Help Desk Monitoring Setup
c. Hard Disk Management System d. High Definition Management Setup
100. Under IT Modernization Project, WCTC refers to:
(LGO Exam-2024 Himachal Pradesh Circle)
a. Work Place Career Training Centre b. Work Place Capacity building Training Centre
c. Work Place Computer Training Centre d. Work Continuity Training Centre
101. What is the Toll- Free number for ATM/debit card, mobile/internet/SMS
banking- related grievances in the Department of Posts?
(LGO Exam-2024 Himachal Pradesh Circle)
a. 1800 524 4240 | b. 1800 425 2440 |
c. 1800 245 4240 | d. 1800 254 2440 |
102. "TNF" in Network Integration under IT Modernization Project 2012 refers to:
(LGO Exam-2024 Himachal Pradesh Circle)
a. Technically Now Feasible | b. Technically Not Feasible |
c. Technically Not Functional | d. Terminal Not Feasible |
103. Under CDS which is the last activity performed?
(LGO Exam-2024 Himachal Pradesh Circle)
a. Day begin | b. Shift begin | c. Shift end | d. E.O.D |
104. As per AML/CFT norms, the review of Customer Due Diligence documents for a High Risk customer should be done every
(LGO Exam-2024 Jammu Kashmir Circle)
a. 5 years | b. 2 years | c. 3 years | d. 1 years |
105. What is the full form of SSS?
(LGO Exam-2024 Jammu Kashmir Circle)
a. System Static Software | b. System Source Server |
c. Staff Scheduling System | d. Staff Source Server |
106. With regards to IT project of DOP what does 'BI' stand for?
(LGO Exam-2024 Jammu Kashmir Circle)
a. Business Intelligence | b. Backup Internet |
c. Basic Infrastructure | d. Backup Infrastructure |
107. In terms of network, what does NSP stand for?
(LGO Exam-2024 Jammu Kashmir Circle)
a. Network Service Provider | b. National Service Provider |
c. Nation Service Package | d. Network Service Package |
108. What is the full form of GL?
(LGO Exam-2024 Jammu Kashmir Circle)
a. Global Ledger | b. Global List |
c. General Ledger | d. General List |
109. Which on the following is not a part of the IT Modernization project?
(LGO Exam-2024 Jammu Kashmir Circle)
a. CSI | b. RSI | c. MMU | d. FSI |
110. DPMS and IPVS are part of which of the following:
(LGO Exam-2024 Jammu Kashmir Circle)
a. CSI | b. FSI | c. RSI | d. NI |
111. The software FINACLE has been developed by
(LGO Exam-2024 Jammu Kashmir Circle)
a. TCS | b. CEPT | c. NIC | d. Infosys |
112. How do FINACLE figures get populated in DTR?
(LGO Exam-2024 Jammu Kashmir Circle)
a. Automatically | b. Voucher Posting |
c. Updated by CPC | d. Posting tool |
113. Which of the following will work in offline mode?
(LGO Exam-2024 Jammu Kashmir Circle)
a. FINACLE | b. PMA |
c. POS | d. MCCAMISH |
114. With drawl from SSA account is to be done from which FINACLE menu?
(LGO Exam-2024 Jammu Kashmir Circle)
a. CPWTM | b. HFINRPT | c. CCRC | d. HSWITD |
115. IPVS is used for the following:
(LGO Exam-2024 Bihar Circle)
a. Bag Opening | b. Bag Closing |
c. Article Tracking | d. All of the above |
116. The NANYATHA App is being used for:
(LGO Exam-2024 Bihar Circle)
a. Post Box Issue | b. Letter box clearing |
c. Delivery of Big Parcel | d. Booking of Parcel |
117. Which Portal is used for CSI ID management including CSI ID Password set/reset, Role assignment to Employees, ID Enable/disable,etc.
(LGO Exam-2024 Bihar Circle)
a. SAP | b. POS | c. IM | d. PMA |
118. In IT modernization Project 2.0, by whom the Rural Hardware Devices were provided to BPMs?
(LGO Exam-2024 Bihar Circle)
a. Department of Post | b. Ministry of Finance |
c. India Post Payment Bank | d. None of these |
119. The IT Modernization Project 2.0 was approved by Cabinet on:
(LGO Exam-2024 Bihar Circle)
a. 19th June 2022 | b. 19th January 2022 |
c. 19th April 2021 | d. 17th July 2020 |
120. The HDMS is the abbreviation of:
(LGO Exam-2024 Bihar Circle)
a. HalfDue Market System b. Help Desk Management System
c. HalfDak Management System d. HighDak Marketing System
121. Which is not a portal for lodging of complaint?
(LGO Exam-2024 Bihar Circle)
a. CPGRAM Portal | b. CRM Portal |
c. CIC Portal | d. None of these |
122. The Quick Matrix is the portal for:
(LGO Exam-2024 Bihar Circle)
a. PLI Premium Deposit b. IPPB Account Opening
c. Booking of Speed Post Article at Home d. Lodging of complaint
123. What is UAT in IT?
(LGO Exam-2024 Karnataka Circle)
a. User Aggregate Testing | b. User Accept Testing |
c. User Acceptance Testing | d. Unique Acceptance Testing |
124. What is the latestFinacle DOP version being used in Post Offices?
(LGO Exam-2024 Karnataka Circle)
a. 9 | b. 10 | c. 8 | d. 7 |
125. Abbreviation of LMS in IT?
(LGO Exam-2024 Karnataka Circle)
a. Lead Management System | b. Lead Monitoring System |
c. Lead Maintenance System | d. Learning Management System |
126. Abbreviation ofi-GOT?
(LGO Exam-2024 Karnataka Circle)
a. Integrated Government Online Training b. Inspector General of Taxation
c. Integrated General Online Training d. Integrated Government Offline Training
127. Digital Address is basedon ?
(LGO Exam-2024 Karnataka Circle)
a. Pincode | b. PinPlus |
c. Lat-Long | d. Delivery Office |
128. URL for ESS Portal?
(LGO Exam-2024 Karnataka Circle)
a. https://sapep.indiapost.gov.in/iri/portal b. https://sapep.indiapost.gov.in/ess/portal
c. https://sapep.indiapost.gov.in/mss/portal d. https://sapep.indiapost.gov.in/hrms/ess
129. Abbreviation of ECMS?
(LGO Exam-2024 Karnataka Circle)
a. Enterprise Content Management System b. Enterprise Crisis Management System
c. Electronic Construction Management Systemd. Enterprise Content Maintenance System
130. DIGI-DAK means?
(LGO Exam-2024 Karnataka Circle)
a. Digital Driven Accelerated Knowledge-base b. Digital DAK
c. Digitally Driven Accelerated Knowledge-based. Digital Driven Accelerated Knowledge
131. Nanyatha Software is using for?
(LGO Exam-2024 Karnataka Circle)
a. Clearance of Letters | b. AEPS |
c. Philately | d. DBT Payments |
132. Location of Command Control Centre in IT?
(LGO Exam-2024 Karnataka Circle)
a. CEPT Mysore | b. CEPT Bangalore |
c. CEPT Chennai | d. Postal Directorate |
133. The new Post Office Act which is recently passed in Parliament related to?
(LGO Exam-2024 Karnataka Circle)
a. Powers to intercept postal articles b. Exclusive privileges of the Central Government
c. Exemptions from liability d. All the above
134. ATMs of India Post are Interoperable from?
(LGO Exam-2024 Punjab Circle)
a. 2015 | b. 2016 | c. 2018 | d. 2019 |
135. Vendor for Financial System Integrator Project under IT Modernization Project was
(LGO Exam-2024 Punjab Circle)
a. Sify Technologies Limited | b. Reliance Consultancy Services |
c. Infosys Technologies Limited | d. None of the above |
136. What is amount approved by Government of India for IT Modernization Project (2.0) 2022?
(LGO Exam-2024 Punjab Circle)
a. 5785 Cr. | b. 5585 Cr. | c. 5440 Cr. | d. 4840 Cr. |
137. Who is the Chairperson of Banking Technology Committee Track P02 of Project Management Committee under IT Modernization Project 2.0?
(LGO Exam-2024 Punjab Circle)
a. ADG Financial Services | b. Member Personnel |
c. DDG Financial Services | d. GM CEPT |
138. Who is the Chairperson of Insurance Technology Committee Track P03 of Project Management Committee under IT Modernization Project 2.0?
(LGO Exam-2024 Punjab Circle)
a. AGM PLI | b. CGM PLI |
c. GM PLI | d. Member PLI |
139. Who is the Chairperson of Parcel and Mail Management Technology Committee Track P04 of Project Management Committee under IT Modernization Project 2.0?
(LGO Exam-2024 Punjab Circle)
a. CGM Parcel | b. GM Parcel |
c. AGM Parcel | d. DG Posts |
140. Banking Solution under IT Modernization Project 2.0 includes?
(i) Post Office Savings Bank and other financial services
(ii) Enterprise Fraud Risk Management System
(iii) Rural Hardware Device Specifications
(LGO Exam-2024 Punjab Circle)
a. Only (i) & (ii) | b. Only (ii) & (iii) |
c. Only (i) & (iii) | d. All of the above |
141. Solution Architecture under IT Modernization Project 2.0 includes?
(i) Banking Solution
(ii) Insurance Management System
(iii) One Postal Interface
(LGO Exam-2024 Punjab Circle)
a. Only (i) & (ii) | b. Only (ii) & (iii) |
c. Only (i) & (iii) | d. All of the above |
142. What is the role of Project Steering Committee under IT Modernization Project 2.0?
(i) To Sanction all projects under DOP IT 2.0
(ii) Revise the estimates under the overall outlay approved by PIB
(iii) Monitor and review the implementation of the Project
(LGO Exam-2024 Punjab Circle)
a. Only (i) & (ii) | b. Only (ii) & (iii) |
c. Only (i) & (iii) | d. All of the above |
143. What is the period for which IT Project 2.0 of India Post has been approved?
(LGO Exam-2024 Punjab Circle)
a. 2022-23 to 2029-30 | b. 2021-22 to 2029-30 |
c. 2020-21 to 2028-29 | d. None of the above |
144. What is the rate of Printed Post Card (Postcards containing printed communication)
(LGO Exam-2024 Punjab Circle)
a. Rs.2 | b. Rs. 4 |
c. Rs. 6 | d. None of the above |
145. What does the abbreviation CIS under India Post IT modernization project signify?
(LGO Exam-2024 Rajasthan Circle)
a. A complete technology solution for the banking products of India Post.
b. A complete technology solution for mail operations & accounting.
c. A complete technology solution for insurance services.
d. A complete solution for all services including banking/insurance and mail operations.
146. What does the term NI (Network Integrator) in IT 1.0 signify?
(LGO Exam-2024 Rajasthan Circle)
a. Providing connectivity for each departmental post office location in Order to ensure uninterrupted network connectivity through one single WAN.
b. Providing connectivity for each post office location in order to ensure uninterrupted network connectivity through one single WAN.
c. Providing connectivity for each branch post office location in order to ensure uninterrupted network connectivity through one single WAN.
d. Providing connectivity for each head post office location in order to ensure
Uninterrupted network connectivity through one single WAN.
147. Under the India Post IT Modernization Project where is the Disaster Recovery
Centre located
(LGO Exam-2024 Rajasthan Circle)
a. Chennai | b. Navi Mumbai |
c. Mysore | d. Bengaluru |
148. Under the India Post IT Modernization Project, which one is NOT true about Data Centre Facility?
I) The department has moved from standalone central server based operations to a uniform local server based operation.
II. It is located at Navi Mumbai, housed in space provided by vendor.
III. It is located at Mysore in departmental premises.
(LGO Exam-2024 Rajasthan Circle)
a. I & II only | b. II only |
c. I & III only | d. None of the above |
149. Which of the following applications are developed by CEPT, Mysore?
I) Post Info
II. PMA
III. CBS
IV. CSI
(LGO Exam-2024 Rajasthan Circle)
a. I & II | b. I only |
c. II only | d. None of above |
150. What is the toll free number of "India Post 4 Help Centre" aiming to assist general public?
(LGO Exam-2024 Rajasthan Circle)
a. 1924 | b. 1234 | c. 1824 | d. 1934 |
151. What does the term DARPAN stands for?
(LGO Exam-2024 Rajasthan Circle)
a. Digital Advancement and reform of Parcel networking
b. Digital Access of Rural Postal Services and Networking
c. Digital Advancement and Reform PAN India
d. Digital Advancement of Rural Post Offices for a New India
152. The Postman Mobile Application has the following features-
I) It is integrated to DPMS.
II. It captures the GPS coordinates of the location where delivery is done.
III. It is an android application developed by CEPT Chennai.
(LGO Exam-2024 Rajasthan Circle)
a. All of the above | b. II only |
c. II & III only | d. None of the above |
153. With respect to Digital Life Certificate (DLC) which of the following is NOT true
(LGO Exam-2024 Rajasthan Circle)
a. Digital Life Certificate cangenerated by biometric authentication.
b. Jeevan Praman Portal has been developed by CEPT Mysuru for DLC.
c. Pensioner may be physically present at Post Office or send DLC.
d. Pensioner should also send his non- employment certificate.
154. What does the term CBS stand for-
(LGO Exam-2024 Rajasthan Circle)
a. Centralized Banking System | b. Core Banking Solution |
c. Consolidated Banking Solution | d. Concentrated Banking Solution |
155. "The New Post Office Bill" was initiated in which year?
(LGO Exam-2024 Rajasthan Circle)
a. 2024 | b. 2023 | c. 2022 | d. 2021 |
156. DARPAN Means
(LGO Exam-2024 Telangana Circle)
a. Digital Arrangement of Rural Post offices for a New India
b. Digital Advancement of Rural Post offices for a New India
c. Digital Advancement of Rural Post offices for a Noble India
d. Digital Advancement of Regional Post offices for a New India
157. ERP Means
(LGO Exam-2024 Telangana Circle)
a. Enterprise Review Planning | b. Enterprise Resource Procedure |
c. Engineering Resource Planning | d. Empanelled Resource Planning |
158. Under which Project Department has supplied Mobile Phones to Postmen
(LGO Exam-2024 Telangana Circle)
a. Rural Hardware | b. Mail Operations Hardware |
c. Core System Integrator | d. Rural System Integrator |
159. Change Management Project is
(LGO Exam-2024 Telangana Circle)
a. To prepare employees for the change through training
b. To change all the old hardware with new compatible hardware
c. To change all the old software with new compatible software
d. To change all the training Modules
160. RSI means
(LGO Exam-2024 Telangana Circle)
a. Rural System Information | b. Rural Service Integrator |
c. Rural System Integrator | d. Research and Service Indicator |
161. DRC means
(LGO Exam-2024 Telangana Circle)
a. Data Recovery Centre | b. Disaster Recovery Centre |
c. Disaster Resource Centre | d. Data Resource Centre |
162. MGNREGS means
(LGO Exam-2024 Telangana Circle)
a. Mahatma GandhiNano Rural Employment Guarantee Scheme
b. Mahatma Gandhi National Rural Empowerment Guarantee Scheme
c. Mahatma Gandhi National Rural Employment Guarantee Scheme
d. Mahatma Gandhi National Rural Employment Guarantee System
163. Solar Powered, Micro ATM Complaint hand-held devices were supplied to Rural Post offices in
(LGO Exam-2024 Telangana Circle)
a. IT 1.0 | b. IT 2.0 |
c. IT 3.0 | d. None of the above |
164. Finacle has been introduced under which Silo of IT 1.0
(LGO Exam-2024 Telangana Circle)
a. Rural System Integrator | b. Core System Integrator |
c. Core Banking Solutions | d. Financial System Integrator |
165. Which one of the following is not a part of IT Modernization Project 1.0?
(LGO Exam-2024 Telangana Circle)
a. Supply of Mobile phones to Postmen b. Train the BPMs to adopt the changes
c. Supply of Mobile phones to BOS d. Implementation of Core Insurance Solutions
166. The abbreviation PNOP used for
(LGO Exam-2024 Maharashtra Circle)
a. Postal Network Optimization Project b. Parcel Network Optimization Project
c. Postal Network Organization Project d. None of the above
167. The Core system Integrator (CSI) the Post Office is classified into
(LGO Exam-2024 Maharashtra Circle)
a. Profit Center | b. Fund Center |
c. Cost Center | d. All the above |
168. In IT Project, NI refers to…..
(LGO Exam-2024 Maharashtra Circle)
a. Network Integrator | b. National Integrator |
c. Network Institute | d. National Institute |
169. Which Module is used for accounting in CSI (SAP) applications?
(LGO Exam-2024 Maharashtra Circle)
a. Back Office Module | b. IPVS Module |
c. DPMS Module | d. F&A Module (Core Accounting) |
170. The term 'WAN' in IT modernization project of Department of Posts refers to:
(LGO Exam-2024 North-Eastern Circle)
a. Wrong Account Number | b. Wide Area Network |
c. Wide Average Network | d. Wide Area Number |
171. The term 'DRC in IT modernization project of Department of Posts refers to:
(LGO Exam-2024 North-Eastern Circle)
a. Data Recovery Centre | b. Data Reserve Centre |
c. Disaster Recovery Centre | d. Digital Reserve Centre |
172. Which of the following was launched first in Department of Posts under IT Modernization?
(LGO Exam-2024 North-Eastern Circle)
a. Mobile Banking | b. Internet Banking |
c. ATM services | d. Interoperable ATM services |
173. Which of the following stream of IT modernization project computerized SB and PLI operations of Department of Posts?
(LGO Exam-2024 North-Eastern Circle)
a. FSI | b. CSI | c. MOH | d. DCF |
174. "NI" with reference to IT modernization stands for?
(LGO Exam-2024 North-Eastern Circle)
a. Negative Indicator | b. Network Inclusion. |
c. National Information. | d. Network Integrator |
175. Information Technology Modernization Project 2.0 of Department of Post has been approved by the Government with an outlay of Rs. (a)……. For a period of (b)…… years
(LGO Exam-2024 North-Eastern Circle)
a. (a) 5125 Crores (b) 10 Years | b. (a) 5485 Crores (b) 9 Years |
c. (a) 5785 Crores (b) 8 Years | d. (a) 5935 Crores (b) 7 Years |
176. For what abbreviation "CSI stands for in IT project of Department of Posts?
(LGO Exam-2024 North-Eastern Circle)
a. Core System Integrator | b. Central System Integrator |
c. Core Solution Inventor | d. Central Service Inventor |
177. Indie Post 2012 Project is related to which of the following?
(LGO Exam-2024 North-Eastern Circle)
a. Estate Management | b. IT Modernization. |
c. Material Management | d. Procurement Systems |
178. Postman Mobile Application (PMA) is related to which of the following?
(LGO Exam-2024 North-Eastern Circle)
a. Banking operations | b. Mail Deliveryupdation |
c. Insurance Transactions | d. Stamp sale |
179. Term "HFINRPT is used in which of the following platform?
(LGO Exam-2024 Uttarakhand Circle)
a. Finacle | b. Macmish | c. SAP | d. DPMS |
180. In reference with the IT Modernization project, the term PMU refers to?
(LGO Exam-2024 Uttarakhand Circle)
a. Project Management Unit | b. Power Management Unit |
c. Pressure Measuring Unit | d. None of the above |
181. IT Modernization project has been divided into how many segments?
(LGO Exam-2024 Uttarakhand Circle)
a. Five | b. Six |
c. Seven | d. None of the above |
182. Terms "NSP-1 and NSP-2” are associated with which of the following?
(LGO Exam-2024 Uttarakhand Circle)
a. Network connectivity | b. Finacle updates |
c. SAP updates | d. Bi Tools |
183. "EMV" chip is used in which of the item?
(LGO Exam-2024 Uttarakhand Circle)
a. ATM card | b. RICT Device |
c. Barcode scanner | d. None of the above |
184. "DARPAN" associated with which of the following?
(LGO Exam-2024 Uttarakhand Circle)
a. General Post Offices | b. Head Post Offices |
c. Rural Post Offices | d. Mail Offices |
185. Word WAN (Wide Area Network) relates to which segment of IT Moderations project?
(LGO Exam-2024 Uttarakhand Circle)
a. MOH | b. RH |
c. CM | d. None of the above |
186. Under IT Modernization Project, Data Recovery Centre facility is established in which city?
(LGO Exam-2024 Uttarakhand Circle)
a. Mysuru | b. Bengaluru |
c. Navi Mumbal | d. None of the above |
187. ATMS are interoperable with effect from
(LGO Exam-2024 Uttarpradesh Circle)
a. 31-12-2016 | b. 01-04-2017 | c. 31-12-2018 | d. 01-04-2016 |
188. Which of the following is true in terms of NetworkIntegrator
(LGO Exam-2024 Uttarpradesh Circle)
a. It has three network providers NSP-1. NSP-11 NSP-III
b. It has only one network NSP-I
c. It has two networks NSP-4, NSP-1
d. None of the above
189. FSI stands for
(LGO Exam-2024 Uttarpradesh Circle)
a. Financial Services Integrator | b. Financial Services Integration |
c. Functional Services Integration | d. None of the above |
190. DARPAN stands for
(LGO Exam-2024 Uttarpradesh Circle)
a. Digital advancement of rural Post office for a new India
b. Drastic advancement of rural Post office for a new India
c. Diplomatic advancement of regional Post office for a new India
d. None of the above
191. What is the correct meaning of CBS under IT modernization project-
(LGO Exam-2024 Uttarpradesh Circle)
a. Cloud Based Service | b. Core Banking Solution |
c. Cloud Banking Solution | d. Core Based Service |
192. What was the change management stream of IT modernization project
(LGO Exam-2024 Uttarpradesh Circle)
a. Changing the old computers
b. Changing the products & Services of the Department
c. Training, preparing all the employees of the Department including GDS
d. Changing all the earlier vendors of the Department
ANSWER
1. | c | 2. | a | 3. | a | 4. | a | 5. | a |
6. | d | 7. | a | 8. | d | 9. | a | 10. | d |
11. | a | 12. | b | 13. | c | 14. | c | 15. | a |
16. | c | 17. | d | 18. | c | 19. | b | 20. | c |
21. | d | 22. | a | 23. | a | 24. | d | 25. | a |
26. | b | 27. | b | 28. | c | 29. | c | 30. | d |
31. | d | 32. | b | 33. | a | 34. | a | 35. | a |
36. | c | 37. | c | 38. | c | 39. | d | 40. | a |
41. | b | 42. | c | 43. | a | 44. | b | 45. | b |
46. | b | 47. | c | 48. | b | 49. |
| 50. | d |
51. | b | 52. | a | 53. | b | 54. | d | 55. | b |
56. | d | 57. | b | 58. | c | 59. | d | 60. | c |
61. | b | 62. | c | 63. | b | 64. | a | 65. | d |
66. | a | 67. | a | 68. | b | 69. | a | 70. | a |
71. | d | 72. | a | 73. | a | 74. | b | 75. | c |
76. | c | 77. | c | 78. | a | 79. | c | 80. | b |
81. | b | 82. | d | 83. | b | 84. | d | 85. | b |
86. | d | 87. | c | 88. | b | 89. | a | 90. | b |
91. | c | 92. | d | 93. | d | 94. | d | 95. | b |
96. | d | 97. | c | 98. | b | 99. | a | 100. | c |
101. | b | 102. | b | 103. | d | 104. | b | 105. | c |
106. | a | 107. | a | 108. | c | 109. | c | 110. | a |
111. | d | 112. | a | 113. | c | 114. | a | 115. | d |
116. | b | 117. | c | 118. | c | 119. | a | 120. | b |
121. | c | 122. | d | 123. | c | 124. | b | 125. | a |
126. | a | 127. | c | 128. | a | 129. | a | 130. | a |
131. | a | 132. | b | 133. | d | 134. | b | 135. | c |
136. | a | 137. | c | 138. | b | 139. | a | 140. | d |
141. | d | 142. | d | 143. | a | 144. | c | 145. | c |
146. | a | 147. | c | 148. | b | 149. | a | 150. | a |
151. | d | 152. | c | 153. | b | 154. | b | 155. | b |
156. | b | 157. | c | 158. | b | 159. | a | 160. | c |
161. | b | 162. | c | 163. | a | 164. | d | 165. | c |
166. | b | 167. | d | 168. | a | 169. | d | 170. | b |
171. | c | 172. | c | 173. | a | 174. | d | 175. | c |
176. | a | 177. | b | 178. | b | 179. | a | 180. | a |
181. | d | 182. | a | 183. | a | 184. | c | 185. | d |
186. | a | 187. | a | 188. | c | 189. | a | 190. | a |
191. | b | 192. | c |
|
|
|
|
|
|